Bridge Surselva

Alte Rheinbrücke, Tavanasa

Das Foto zeigt die alte Rheinbrücke in Tavanasa
Das Foto zeigt die alte Rheinbrücke in Tavanasa

Today's bridge is still well reminiscent of Maillart's structural considerations. In the 19th century, it was considered a bridge construction achievement.

Description

Modern reinforced concrete bridge construction in Switzerland reached an early peak in the first two decades of this century thanks to Robert Maillart's pioneering achievements. It was only with the Tavanasa Bridge that Maillart succeeded in creating a design that consistently detaches itself from the models of stone construction and illustrates the hollowing out and dissolution of the building. A debris flow destroyed the building, which in 1905 already indicated the international style. Today's bridge is still well reminiscent of Maillart's structural considerations. In the 19th century, it was considered a bridge construction achievement.

(Text recorded by: Regiun Surselva)

Contact

Alte Rheinbrücke, Tavanasa

Via Principala 34, 7165 Brigels

Responsible for this content: Surselva Tourism.
This content has been translated automatically.

Outdooractive Logo

This website uses technology and content from the Outdooractive platform.